Mass Lic#: 59652                 RI Master Pipefitter Lic# 6551
   
 

Blanchard Snow Melt
14_13a
The owner couldn't get anyone to plow his driveway. 7 guys tried and 7 guys left. So on this job we installed two V77 Burnham Boilers.
07_06a
Control strategy utilizes a Tekmar 252 staging control and a Wirsbo 201 snowmelt control.
17_16a
This driveway and sidewalk is about 3000 sq ft. It has a little over 6000 feet of 5/8 tubing being fed by 300 feet of 1 1/4 tubing.
06_05a
There are 5 manifold location 4 for the driveway and 1 for the sidewalk.
04_03a
This is a long steep driveway.
13_12a
Look real hard in the middle of this picture. You will see the slab sensor which measures the tempature of the slab and sends it back to the control.
09_08a
If you want a great looking driveway like this, give PRM Concrete a call (401)724-1010 and Steve Tougas (401)826-0760.
22_21a
If you want it with Snowmelt, give us a call and we will handle it all! Steve will be doing the rest of our driveways and sidewalks.
20_19a
"Let it snow, let it snow, let it snow!"

 
   
         
home - about us - project photos - consulting - information - service - links - contact us - site map
Content copyright 2010 by Advanced Comfort Systems, Inc.
Web site design and hosting by Alliance Computer Solutions, LLC