| Boston Residence Snow Melt |

- Here is the insulation with the wire mesh installed before tubing is tied down. The picture on the left shows tubing down tied in place.

- This photo shows the sand bed being installed on top of the insulation and tubing before the pavers are installed.

- Here we installed are supply and return lines of 1¼" HePex. It doesn't show it but we insulate the lines all the way back to the main manifold.

- In this photo you can see insulation, tubing, sand bed and pavers for the driveway. The guy in the picture is STORMN NORMAN a real true friend!

- Here is the main manifold located under the garage. The manifolds you see on the wall are for the basketball court.

- The finished driveway.

- The finished tennis/basketball court.
|
|
|
|