Boston Residence Snow Melt
Schum03
Here is the insulation with the wire mesh installed before tubing is tied down. The picture on the left shows tubing down tied in place.
Schum07
This photo shows the sand bed being installed on top of the insulation and tubing before the pavers are installed.
Schum08
Here we installed are supply and return lines of 1¼" HePex. It doesn't show it but we insulate the lines all the way back to the main manifold.
Schum09
In this photo you can see insulation, tubing, sand bed and pavers for the driveway. The guy in the picture is STORMN NORMAN a real true friend!
0003
Here is the main manifold located under the garage. The manifolds you see on the wall are for the basketball court.
Pic00024
The finished driveway.
Pic00021
The finished tennis/basketball court.